Where can spare parts be obtained?
Original spare parts for the small Diamond package wastewater (sewage) treatment plant are available directly from our network of...
-
February 16, 2017
How long does it take for a wastewater (sewage) treatment plant to start working?
Your newly installed wastewater (sewage) treatment plant can be used immediately! The biological process can take between 6-8 weeks...
-
February 16, 2017
What is domestic wastewater?
Domestic wastewater tends to originate from plumbing fixtures and appliances. This can include waste from toilets, dish washing, laundry,...
-
February 16, 2017
How are domestic wastewater/sewage treatment plants installed?
Our small Diamond package sewage treatment tanks are designed to sit below ground. The Kiosk can be installed above...
-
February 15, 2017
What is the difference between a septic tank and a package wastewater (sewage) treatment plant?
Unlike the traditional septic tanks, the modern package wastewater (sewage) treatment plants are designed with an aerated process for...
-
February 15, 2017
What is a percolation test?
A percolation test is required for a drainage field to assess how much water can drain away through the...
-
February 14, 2017
Do domestic wastewater (sewage) treatment plants need service and maintenance?
Yes, all wastewater (sewage) treatment plants will need service and maintenance in order to ensure an efficient and reliable...
-
February 14, 2017
Where can I discharge to?
The treated final effluent from your package sewage treatment plant can be discharged in to a water course or...
-
February 14, 2017
How will I know if I have a high water table area?
This can be determined by digging a trial hole and leaving it open for 48 hours for a site...
-
February 14, 2017
Is approval required to install a small domestic wastewater (sewage) treatment plant?
England General binding rules state that your small wastewater (sewage) treatment system must meet the relevant British Standard in...